Digging out and lowering the area
The soil was fully dug out and the ground lowered, so the new deck could sit at the right height rather than being built up on top of the old levels.
Case study · Norbury SW16 · March 2026
Claudia's long garden in Norbury was dug out and lowered, then decked from the house to the far end with 35m² of softwood on a brand new frame over a weed membrane. The boards are laid in two different designs, with a step down to a lower section, and a concrete path finishes the area around a manhole cover that could not be lowered. Three days, £7,000 including VAT.
Where we started
Claudia's garden in Norbury is long and narrow, running down from the back of the house between trellis-topped fences. Claudia wanted it decked from end to end.
That meant digging the soil out and lowering the area first, building a new frame, and planning the levels so the deck works with the house, a manhole cover and the slope at the far end. It is a typical project for our decking in Norbury, close to our own base.
Before & after
The tricky parts
Step by step
The soil was dug out and the area lowered along the length of the garden.
A weed membrane was laid over the ground, and a new softwood frame was built and levelled across the garden.
The boards were laid in two different designs, with a step down to a lower section at the far end.
The manhole cover could not be lowered, so a concrete path was laid around it where it meets the deck.
The finished work








Budget
This deck cost £7,000 including VAT over three days, covering digging out and lowering the ground, the weed membrane, the new frame, 35m² of softwood decking in two designs with a lower section, and the concrete path around the manhole. That works out at about £200 per m² for the complete job. See our decking in Norbury page for more options.
Get a free quoteQuestions
Thinking about something similar? These are the questions we hear most.
Claudia's 35m² softwood deck in Norbury SW16 cost £7,000 including VAT and took three days, including digging out and lowering the ground, a weed membrane, a new frame, two board designs with a lower section and a concrete path around the manhole. That is about £200 per m² for the complete job.
Lowering the ground lets the deck sit at the right height for the house and doors, instead of being built up on the old levels, which can leave it too high or create awkward steps.
Yes. Changing the board direction, or using two designs in different areas, breaks up a long deck and makes it more interesting, as in Claudia's garden.
Manholes must stay accessible. Where a cover can be lowered we can deck over it with a hatch; where it is too high, like Claudia's, we finish around it neatly, here with a concrete path.
It is strongly recommended. A membrane over the ground stops weeds growing up between the boards while still letting water drain away.
Claudia's took three days, including digging out and lowering the ground, the membrane, the frame, both board designs and the concrete path.
Pressure-treated softwood is a good-value, natural-looking choice. It needs occasional cleaning and treating to keep it looking its best, while composite costs more but needs less upkeep.
Yes. Norbury is our home base, and we work across Streatham, Thornton Heath, Mitcham and Croydon. See all our landscaping in Norbury.
Free survey
Tell us about your garden and we will arrange a visit and a written quote.
020 3633 5529 info@finelandscape.co.ukFine Landscape Ltd
31 Tylecroft Road, Norbury, London SW16 4BL
Free enquiry. No obligation.