Solid groundwork starts beneath Carshalton's clay-heavy soil, where proper footings make all the difference. Whether you're extending that Edwardian semi or building fresh on those tricky sloped plots near Carshalton Beeches, the foundation sets everything right.
Response within 24 hours
Those chalky clay patches around Butter Hill and the water table variations near the Wandle create specific challenges for SM5 properties. Foundation work here isn't just about digging and pouring concrete. Local knowledge matters when you're dealing with the mix of London clay and river gravels that characterise this part of Surrey, particularly where older Victorian properties meet newer developments.
Strip foundations suit most Carshalton homes, though the depth varies dramatically between Stanley Park's firm ground and the softer areas towards Hackbridge. Reinforced concrete footings go down typically 1-1.5m here, deeper where tree roots from those mature oaks along Park Lane have dried the clay. Modern techniques like ground beams work brilliantly for extensions, especially on those narrow plots between Wallington and the high street where access proves challenging.
Fifteen years watching Carshalton evolve means understanding which streets flood, where the old watercress beds still affect drainage, and why properties near Sutton Common need extra attention. Building control knows our work across SM5 because consistency matters when you're literally supporting someone's home.




Rated 4.9/5 from over 280 verified reviews
Single-storey rear extensions around Carshalton usually need £3,500-£5,500 for foundations, though those period properties with deeper requirements might reach £7,000. Two-storey projects start from £6,000, varying with ground conditions and accessibility.
Absolutely - from the conservation area around Carshalton Ponds to new builds near Hackbridge station. Regular projects span Strawberry Lane to Boundary Road, including those compact sites backing onto the Sutton borders.
Standard residential footings take 8-12 days from excavation to ready-for-brickwork, weather permitting. Complex sites or poor January conditions might stretch to three weeks, particularly if dewatering's needed.
Each foundation carries decade-long protection against settlement or structural issues. This covers the concrete work, reinforcement, and waterproofing membrane - essentially everything below ground level that forms your building's base.
Most pre-1940s properties around Carshalton have foundations adequate for typical loft conversions, as Victorian builders often over-engineered. However, structural calculations confirm load capacity - sometimes revealing pleasant surprises about your home's hidden strength.
Get your free, no-obligation quote today.