Those grand Victorian terraces lining Battersea's leafy streets need rock-solid foundations to stand another century. Whether you're extending into that generous garden or underpinning a period property, getting the groundwork right determines everything that follows.
Response within 24 hours
Battersea's mix of architectural styles presents fascinating foundation challenges. From the clay-heavy soil near Battersea Park to the former industrial ground around Nine Elms, each plot tells its own geological story. Victorian builders worked miracles with shallow footings, but modern loads and basement conversions demand contemporary engineering solutions that respect the original structure whilst meeting today's building regulations.
Strip foundations suit most Battersea extensions, typically reaching 1.2m deep to bypass the notorious London clay's seasonal movement. Raft foundations become essential where ground conditions prove trickier - particularly near the Thames flood plain. Mini-pile solutions work brilliantly for tight spaces between neighbouring properties, common in SW11's densely packed streets. Each technique requires precise calculation of loads, soil analysis, and careful consideration of party wall agreements.
Twenty years digging beneath Battersea's streets teaches you which corners hide old wells and where Victorian builders cut corners. Local knowledge matters when you're working inches from a neighbour's hundred-year-old foundations.




Rated 4.9/5 from over 280 verified reviews
Single-storey rear extensions typically require £8,000-£15,000 for foundations, whilst double-storey projects range £15,000-£25,000. Basement underpinning starts around £40,000, varying with depth and proximity to boundaries.
Absolutely - from the conservation areas near Clapham Junction station to the riverside developments towards Chelsea Bridge. Regular projects include Northcote Road, Lavender Hill, and the quieter streets off Battersea Bridge Road.
Standard strip foundations take 2-3 weeks including excavation and concrete curing. Complex underpinning projects need 6-8 weeks, especially when working around occupied properties.
Every foundation project includes decade-long structural warranty documentation, backed by professional indemnity insurance and full compliance certificates for building control sign-off.
Often they need reinforcement - Victorian footings rarely exceed 450mm depth. We assess load paths and typically recommend partial underpinning or parallel foundations to protect the original structure whilst supporting new loads.